BR 497, Appendix B, Worked Example 3 (E1 — Steel lintel with perforated steel base-plate)
This report covers one junction detail and the component it depends on: Perforated steel base-plate, modelled separately and reduced to an equivalent thermal conductivity in accordance with BR 497 §2.3.1, and the E1 Steel lintel with perforated steel base plate junction that uses it. Both were calculated from the drawn cross-section using BS EN ISO 10211:2017, following the conventions of BR 497.

This component represents a repeating segment of a perforated steel base-plate detailing, designed to mitigate thermal conduction across a structural steel profile. The primary structural body comprises a solid steel plate running continuously between an internal thermal environment on the left edge and an external environment on the right edge. The top and bottom horizontal boundaries are treated as adiabatic cut lines, reflecting symmetry planes within a broader repeating perforation pattern. To introduce thermal resistance across the high-conductivity steel path, the plate is interrupted by a staggered array of elongated, plaster-filled slots. The slots alternate in an interlocking configuration, featuring continuous full-height internal capsules flanked on either side by pairs of opposed slots extending inward from the top and bottom edges. This geometric arrangement forces heat flow along a tortuous, meandering conductive pathway through the steel matrix, with the lower-conductivity plaster infill filling the voids to maintain physical continuity across the perforated zone.

The component was analysed as a two-dimensional finite element model in accordance with BS EN ISO 10211. A numerical modelling approach was adopted because the complex cross-sectional geometry cannot be simplified into an ordered, one-dimensional layered stack suitable for standard calculation methods. Across the 200.0 mm overall dimension of the component, the primary output determined from the heat flow simulation was an effective thermal conductivity (λ) of 6.9322 W/(m·K). The model comprised regions of steel plate and plaster-filled slots. The overall thermal performance was dominated by the high thermal conductivity of the steel plate (50.0 W/(m·K)), which was moderated by the presence of the plaster-filled slotted zones characterised by a significantly lower thermal conductivity of 0.57 W/(m·K). The relative proportions and distribution of these two materials within the cross-section governed the lateral and transverse heat flow paths, establishing the resultant equivalent performance for the combined assembly.
| Ref | Label | K1 Default | Adopted ψ | fRsi | Status |
|---|---|---|---|---|---|
| E1 | Steel lintel with perforated steel base plate | 1.000 | 0.412 | 0.76 | CALCULATED |
This table summarises the junctions addressed within this report. It is not a complete SAP 10.3 (13-01-2026) Table K1 schedule — Psiclops models individual junctions; compiling a full compliance schedule remains the responsible engineer's own task.

This junction represents an external cavity wall construction incorporating a standard UK steel box lintel with a perforated base-plate spanning the window or door opening. Proceeding from the external face to the internal warm face, the main wall build-up comprises a clay brick outer leaf, an unventilated clear cavity, a rigid insulation board layer, and an inner leaf of concrete blockwork finished internally with dense plaster. The boundaries identify the outer masonry face as subject to external environmental conditions, while the inner plastered face and soffit are exposed to the internal conditioned environment. At the head of the opening, the regular clear cavity and continuous inner block leaf are interrupted by the steel lintel assembly. The lintel features a structural steel inner box profile supporting the inner masonry leaf, connected across the cavity to an extended outer flange and a perforated steel base-plate forming the soffit. Within the void created by the steel profile and the bridge across the cavity, the section incorporates a combination of insulation board infill and divided, downward-facing cavity air spaces, positioned to maintain thermal resistance across the junction despite the thermal bridging introduced by the structural steel components.

A numerical assessment was carried out for the junction designated as E1 — Steel lintel with perforated steel base plate, in accordance with Table K1 of SAP 10.3 (13-01-2026). The linear thermal transmittance calculation was performed using two-dimensional finite element thermal modelling conforming to the requirements of BS EN ISO 10211:2017 and following the modelling conventions set out in BR 497. The modelling determined a calculated linear thermal transmittance of 0.412 W/(m·K) for the evaluated detail. This calculated ψ-value represents a substantial thermal improvement compared to the default value of 1.000 W/(m·K) specified in Table K1 of SAP 10.3 (13-01-2026) for this junction category, yielding a significantly better result for inclusion within the whole-building energy calculations.

A thermal bridging assessment was carried out to evaluate the risk of mould growth and surface condensation at the junction detailed as an E1 steel lintel with perforated steel base plate. The numerical modelling and temperature factor calculations were performed in accordance with the conventions set out in BRE IP1/06, applying standard assessment boundary conditions in accordance with BS EN ISO 13788:2012. From the steady-state thermal analysis, a minimum internal surface temperature (θsi,min) of 15.22 °C was determined. Based on this value, the temperature factor at the internal surface (fRsi) was calculated to be 0.761. The calculated fRsi value of 0.761 exceeded the critical surface temperature factor threshold of 0.75 required for dwellings. Consequently, the junction satisfied the requirements of the relevant guidance and successfully passed the surface condensation and mould risk assessment.
The following condensation analysis is provided for professional completeness and risk-awareness — it is not itself a compliance criterion for this junction; only the fRsi check above governs BR497/Part L compliance. Where an annual assessment has been run, it is shown against the standard's own fixed UK-wide reference climate (EN ISO 13788 Annex C.1).

An annual condensation analysis to EN ISO 13788 §6.4, rigorous 2D node-wise method, shows the following:
| Month | Ext °C | Ext RH % | Ext VP Pa | Accumulated kg/m | Status |
|---|---|---|---|---|---|
| October | 10.0 | 83 | 1018.7 | 0.000 | Pass |
| November | 5.0 | 88 | 767.2 | 0.000 | Pass |
| December | 1.0 | 88 | 577.6 | 0.000 | Pass |
| January | -1.0 | 85 | 477.7 | 0.000 | Pass |
| February | 0.0 | 84 | 512.8 | 0.000 | Pass |
| March | 4.0 | 78 | 634.0 | 0.000 | Pass |
| April | 9.0 | 72 | 826.2 | 0.000 | Pass |
| May | 14.0 | 68 | 1086.5 | 0.000 | Pass |
| June | 18.0 | 69 | 1423.4 | 0.000 | Pass |
| July | 19.0 | 73 | 1603.2 | 0.000 | Pass |
| August | 19.0 | 75 | 1647.1 | 0.000 | Pass |
| September | 15.0 | 79 | 1346.5 | 0.000 | Pass |
Peak accumulated moisture over the annual cycle: 0 kg/m (per metre of section depth, not per m² of wall face)
No interstitial condensation forms at any point during the modelled year, and this construction passes the annual condensation check.
| Material | λ W/(m·K) | Vapour resistance | Emissivity | Source |
|---|---|---|---|---|
| Steel plate | 50 | Sd 200 m | — | BR 497 Worked Example 3, Step 5 — stated conductivity of the base-plate steel |
| Plaster-filled slot | 0.57 | µ 10 | — | BR 497 Worked Example 3, Step 5 — slots filled with plaster |
| Lintel air space 1 (cavity, downward) | 0.3199 | µ 1 | — | BS EN ISO 6946:2007 Annex B, as BR 497 §2.4 requires — resolved by Psiclops |
| Steel box lintel | 50 | Sd 200 m | — | BR 497 Appendix B, Worked Example 3, Table B3a — conductivity as published; vapour data from BS EN ISO 10456:2007 |
| Insulation board | 0.023 | µ 60 | — | BR 497 Appendix B, Worked Example 3, Table B3a — conductivity as published; vapour data from BS EN ISO 10456:2007 |
| Concrete block (inner leaf) | 1.13 | µ 60 | — | BR 497 Appendix B, Worked Example 3, Table B3a — conductivity as published; vapour data from BS EN ISO 10456:2007 |
| Cavity (unventilated, low-e) | 0.1129 | µ 1 | — | BS EN ISO 6946:2007 Annex B, as BR 497 §2.4 requires — resolved by Psiclops |
| Brick (outer leaf) | 0.77 | µ 10 | — | BR 497 Appendix B, Worked Example 3, Table B3a — conductivity as published; vapour data from BS EN ISO 10456:2007 |
| Plaster (dense) | 0.57 | µ 10 | — | BR 497 Appendix B, Worked Example 3, Table B3a — conductivity as published; vapour data from BS EN ISO 10456:2007 |
| Perforated steel base-plate (equivalent) | 6.9322 | Sd 200 m | — | 2D model solved separately for its equivalent conductivity, per BR 497 §2.3.1 |
| Lintel air space 2 (divided) | 0.285 | µ 1 | — | BS EN ISO 6946:2007 Annex B, as BR 497 §2.4 requires — resolved by Psiclops |
| Lintel air space 3 (divided) | 0.4137 | µ 1 | — | BS EN ISO 6946:2007 Annex B, as BR 497 §2.4 requires — resolved by Psiclops |
Download the solved geometry (JSON) — every polygon, boundary edge, material assignment and boundary condition exactly as calculated, including the conductivities derived for air spaces and referenced assemblies, so this example can be re-derived rather than taken on trust.
This is a fully static example — no live calculation was run to produce this page. It was generated once from BR 497, Appendix B, Worked Example 3 (E1 — Steel lintel with perforated steel base-plate)'s own published construction and boundary conditions, using Psiclops's own calculation engine, checked against the published reference cases of EN ISO 10211, EN ISO 13788, ISO 6946 and ISO 13370. Try your own junction for free →